1 result found
-
Allow for Partial Split Costs in Reports
When splitting a shared cost (eg. "Shared Infrastructure" grouping) by other Attributions (eg. "Product 1" and "Product 2"), customer would like to be able to show only part of the result in a report.
At the moment it is not possible to build a report that combines eg. 30% of "Shared Infrastructure" with "Product 1" and shows the cost of only this. It is only possible to designate a full 100% split of "Shared Infrastructure" and the report must show each Attribution included in the split.
3 votes
- Don't see your idea?